Learning Objectives
After completing this topic you will be able to:
Dry Docking
State
- Part of the weight is taken by the blocks as soon as the ship touches the blocks and reduces buoyancy force by the same amount
Define
- Critical Instant
- Critical Period
- Declivity of the Dock
Explain
- Up thrust P causes a virtual loss of GM
- Up thrust P
- Why GM must remain positive until the critical instant
- Vessel taking the blocks first at any point on the ships length
Calculate (Using Hindship Stability Tables)
- Minimum ships GM to ensure stability until on the blocks overall
- Maximum trim to ensure ship remains stable at the point of ship taking the blocks overall
- Virtual loss of GM and Drafts after water level has dropped by a stated amount
- Draft on Taking the Blocks overall
- Loss in GM for fall in water level after taking the blocks overall
Grounding
Explain
- How the stability of a ship that has grounded at one point on the centerline is reduced the same way as in dry dock.
- How up thrust increase with fall in tide, increases the heeling moment and reduces the stability
Calculate (Using Hindship Stability Tables)
- Virtual loss in GM and drafts of a ship after tide has fallen by a stated amount.
- Point of grounding given initial drafts and drafts after grounding.
Dry docking of a vessel
Dry docking of a vessel
Vessels
are required to dry dock for carrying out mandatory/ statutory surveys
and bottom repairs. There are two types of dry dock
Graving
Graving Dock showing keel and bilge blocks
Graving Dock showing keel blocks and side shores
Up
to the 60’s, when ships were much narrower, they used to dry dock on a
single row of keel blocks, with the toppling controlled by side shores.
Later with beam sizes increasing, they docked on a central row of keel
blocks and one or more rows of blocks on either side.
Floating
Floating dock
A
floating dry dock is literally another vessel which is ballasted so
that the ship can move in afloat, after which the dock is deballasted
until the vessel lined up on the blocks sits on them. It should be noted
that since the dock is also a floating body, the stability of the dock
with the ship on it requires to be considered.
The following media explains about the Dock, Bilge and Side Support Arms:
Declivity of docks
Dry
docks are trimmed by the stern i.e. the bottom of the dry dock slopes
towards the caisson. This slope or trim is called the declivity of the
dock and causes residual water to flow into pits from which it is pumped
out totally empting the dock.
Part of the weight is taken by blocks as soon as the ship touches the blocks and reduces buoyancy force by same amount
After
the ship has been taken into the lock and the caisson gate (Graving
dock) closed, the water/ dock tanks are pumped out. This causes the ship
to sink within the dock, albeight with no change in her draft. Since
the vessel enters with a stern trim the sole piece of the stern frame is
the first to touch the keel block. Subsequent to this the aft draft
falls and the ford draft increases as the water is pumped out.
With
the ships keel touching the blocks, and the water dropping, the
buoyancy is no longer able to support the displacement. The reduction in
trim is an attempt to regain the buoyancy by increasing the volumetric
buoyancy. In terms of trim this may be considered by considering the
reaction at the stern block as a reduction in weight giving rise to a
trimming moment by the head.
The following animation explains about the dry docking
Critical period
Upthrust P on stern touching the blocks
As
the stern touches the block the resultant upthrust/ loss in buoyancy
which causes a virtual loss in GM. This is critical since if the loss is
great enough for the GM to turn negative the ship could topple of the
block and smash into the sides of the dock. The danger of toppling
disappears once the vessel is completely on the blocks/ the side shores
have been firmed up. Therefore the period from first touching the block
to the point where the vessel “takes to” the blocks overall is called
the critical period.
Critical instant and and Why GM must remain positive until the critical instant
After
the vessel initially touches the block and the critical period
commences, the water is steadily pumped out, resulting in further loss
of buoyancy/ increase in the upthrust. This steadily increase until the
instant before the ship is on the blocks overall after which it is
supported by the side shores/ bilge blocks. This instant is called the
critical instant.
The
increase in the loss of buoyancy from the commencement of the critical
period causes a steadily increasing virtual loss of GM and it is
extremely important that until the vessel is fully supported either by
side shores or bottom blocks the initial GM is sufficient to accommodate
this virtual loss in GM without becoming negative and turning
unstable.
Up thrust P=(MCTC ×
)/Distance from the Center of Flotation and Resultant virtual loss of GM
As
stated earlier, the loss in buoyancy/ upthrust at the sole piece acts
as if a weight that has been discharged l mtrs from the tipping center
. This creates a trimming moment.
The virtual loss in GM may be considered from two viewpoints, as a loss of GM created by a virtual rise in G (
) which we will call Type 1 and a reduction in the metacenter M (
) which we will call Type 2
Diag 1
In
our efforts to deduce the virtual loss in GM we will consider a vessel
whose stern is resting on a single row of keel blocks and heel her by a
small angle
. The displacement of the vessel W acts downwards through G and the reaction P acts upward from K. B shifts to
and the force of buoyancy now reduced by P i.e. W-P acts upward through it.
Diag 2
Type 1
Diag - 3
Diag 3
Consider the two parallel but opposite forces W and P. Their resultant W-P acts downward through
. This resultant is horizontally separated by the downward acting W by y mtrs, and from the upward acting P by x mtrs.
The heel
results in a transverse righting moment 
(Since GM, is the new Gm,
is the virtual loss in GM)
Type 2
Diag – 2
Of the three forces, we replace the two forces acting upwards W, and W-P, with the resultant W acting upwards from a point
. This resultant is horizontally separated by the upward acting (W-P) by y mtrs, and from the upward acting P by x mtrs.
The heel
results in a transverse righting moment 
Conditions involved in Dry Docking:
Stability status of the ship before entering dry dock shall be as follows
- Ship’s displacement should be as light as possible considering that the ship is in operational condition. Cargo should not be there and ballast should be minimum.
- There should not be any list.
- Trim should be by stern based on following considerations
- Minimum trim as prescribed by the dry dock authorities.Even keel condition or very small trim by stern is not acceptable to them because they will find it difficult to align the full length of the ship exactly in line with the keel blocks.
- Maximum trim as decided by the Master.During dry-docking the ship suffers loss of GM, which is directly proportional to its trim. Hence, if the trim is too much, the loss of GM suffered by the ship will be large and it could make the ship unstable before it is secured in the dry dock.
- Trim by head would bring the bows in contact with the keel blocks, and the load of the ship will come on it, which could damage the bows, as it is not strengthened for this purpose. Trim by stern will bring the stern frame in contact with the keel blocks, and it has been strengthened to take the load of the ship.
- Maximum draft should be as prescribed by the dry dock authorities to ensure safe entry into the dry dock.
- GM (F) should be adequate so that loss of GM during dry-docking will not make the ship unstable (Zero or –ve GM) before the ship is adequately secured.
The following media explains about the virtual loss of GM during dry docking and also explains how it occurs:
In
modern dry docks the timber shores have been replaced by Bilge blocks,
which are placed on both sides, below the ship, in line with the ship’s
turn of the bilge. These blocks are adjustable so that once the ship’s
bows comes to rest on the keel blocks, the bilge blocks are moved
transversely and jacked-up to embrace the ship effectively in accordance
with its underwater shape. This way the ship is actually resting on
three lines of blocks.
In
ideal conditions the ship may be undocked in the same as docking
condition. However in practical operations it is not likely. Hence it is
imperative that the ship’s officers should always calculate the
stability of the ship before undocking by taking into account all
changes, which may have taken place in the dry dock, with respect to
various tanks and other weights on the ship. Primarily it should be
ensured that the ship’s GM(F) at the critical instant, i.e. when the
bows is about to lift off and the support of bilge blocks or side shores
are not available, is not zero or –ve.
The following media explains about the Dry docking:
Modern Dry Docking
Vessel taking the blocks first at any point on the ships length
Other
than grounding which is taken up in the next section, a vessel in
damaged condition can enter a dock, trimmed by the head. In this case
the critical period commences when the bow touches the block, and the
critical instant is just before the stern takes to the blocks.
For
purposes of calculating the virtual loss in GM, the same formula may be
used, however if trim is required then the trimming moment will have to
be taken from the first point of contact with the bow to the center of
flotation.
Floating Dry Dock
Stages in Dry Docking in a Floating Dry Dock
Now
we come to the other type of dry docks, the ones which float. Floating
dry docks have their own stability issues stemming from the fact that
they have to float and bear the load of the vessel under repair at the
same time.
A
floating dry dock is deballasted and trimmed as per the trim of the
vessel to be dry docked. This results in a shorter Critical period. Once
the ship is on the blocks over all the stability of the ship and dry
dock has to be considered as one unit. The dock has to ensure that it
maintains positive stability when lifting the ship clear of water. Hence
the weight of the ship being dry docked becomes a factor. The KM of the
vessel is now no longer governed only by the buoyancy of herself but it
is a resultant of the ship dry dock unit.
Minimum ships GM to ensure stability until the ship sits on the blocks overall
All examples of dry-docking are solved by the following formulae ---
during dry-docking =
- Loss of GM during dry-docking =
- Final GM(F) = KM – Initial KG – Loss of GM - FSC
- Drop (cm.) =
P is loss of displacement.
Student
should bear in mind that the last formula should only be used when the
drop of water level is given and the ship has not reached the C.I.
Example 1
Fixed Data Type
A
ship of 6500 mt displacement, KM 7.1 m, KG 6.5 m, MCTC 85 tm, and
center of flotation 50 m from APP, with a trim of 0.25 mts by the stern
enters a graving dock. Find her GM at the critical instant.
Trimming moment = 25 cm
85 = 2125 tm
Upthrust 
Virtual loss using Type 1
= 0.043 m
ANS: Final GM at critical instant 
Virtual loss using Type 2
ANS: Final GM at critical instant 
Maximum trim to ensure ship remains stable at the point of ship taking the blocks overall
Example 2
A
ship displacing 3250 mt, 90 m long, KM 5.9 m, KG 5.3 m with center of
flotation 42 m ford of APP, MCTC 38 tm. Find the maximum trim at which
the vessel can enter the dry-dock if the GM at the critical instant is
limited to 0.25,
Initial GM = 5.9 – 5.3 m = 0.6 m
Final GM required = 0.25
Allowable virtual loss = 0.35 m
Type 1
= 222.52 cm
ANS: Maximum allowable trim = 2.225 m
Type 2
ANS: Maximum allowable trim = 2.131 m
Virtual loss of GM and Drafts after water level has dropped by a stated amount
Example 3
A
ship displacing 6500 mt, 200 m long, KM 7.2 m, KG 6.5 m with center of
flotation 102 m ford of APP, MCTC 150 tm, FSM 400 tm, draft F/5.20 m
A/6.10 m. If the metacenter at the critical instant rises by 0.25 m
calculate the virtual GM(F)at critical instant.
Initial Trim = 6.10 – 5.20 = 0.9 m
Upthrust P at critical instant =
GM(F) at C.I=KM + Rise in KM - KG - Loss of GM
- FSC
= 7.2 + 0.25 - 6.5 - 0.135 = 0.063 = 0.752m.
Type 1
= 0.135 m
ANS: Virtual GM = GM(F) at C.I=KM + Rise in KM - KG - Loss of GM
- FSC
= 7.2 + 0.25 - 6.5 - 0.135 = 0.063 = 0.752m
Type 2
= 0.152 m
ANS: Virtual GM = 0.887 – 0.152 = 0.74 m
Draft on Taking the Blocks overall
Example 4
Hindship Type
(To be solved with data obtained from “Trim & Stability Particular of M V Hindship published by Bhandarkar Publications
Hindship at a draft of F/3.82 A/5.38 m
in SW is being dry docked. KG 8.3. m FSC 0.09 m. Calculate i) The GM
after virtual loss at the critical instant. ii) Calculate the forward
and aft drafts and the drop in water level when the GM(F) becomes zero.
F 3.82 m
A 5.38 m
M 4.60 m
Trim 1.56 m by stern
LCF for mean draft of 4.60 m = 73.017 m
Aft draft correction =
Hydrostatic draft = Aft draft – Correction = 5.38 – 0.796 = 4.584 m
At Hydrostatic draft
Displacement 8875.04 mt
MCTC 163.688 tm
LCF 73.020 m
KM 9.211 m
KG 8.300 m
FSC 0.090
GM (Fluid) 0.821 m
- Drop in water level = Initial aft draft before dry-docking – Final aft draft after dry-docking.
- In this example the student has to calculate the final drafts and drop in water level when GM(F) = 0. For this purpose it is necessary to ascertain whether the zero GM will occur before or after critical instant (C.I.). Hence first calculate the GM(F) at C.I. as follows ---
- At C.I. ---
- Trim change
= Initial trim =
= - P = 349.703 tons ; New Displacement = 8875.04 – 349.703 = 8525.337 tons
Hydrostatic draft = 4.424m. ;KM = 9.363m.
= 9.363 – 8.3 – 0.34 – 0.094 = 0.629m.- Hence GM(F) will become zero after the C.I. This means that the ship will be on even keel, side shores or bilge blocks will be in position, the ship will be fully secured, andso there will be no free surface effect.
Method 1
- P = 1005.557 tons ; New W = 8857.04 – 1005.557 = 7851.483 tons
- Hyd. = 4.114m. = Ford. and aft drafts ; Drop = 5.38 – 4.114 = 1.266m.
Method 2
- P = 1005.557 tons ; New W = 8857.04 – 1005.557 = 7851.483 tons
- Hyd. = 4.114m. = Ford. and aft drafts ; Drop = 5.38 – 4.114 = 1.266m.
Example 5
M.V.
Hindship is floating at drafts F 3.82m., A 5.38m., KG 8.3m.and FSC
0.09m. If this ship has to be dry-docked, calculate the forward and aft
drafts and the drop in water level when the GM(F) becomes 0.7m.
- Data
given in this example is same as that of Example 4. Hence, as
calculated in previous example, initial ---Trim = 1.56m. ; Hydrostatic
draft = 4.584m.
Displacement = 8875.04 tons ;MCTC = 163.688 tm. ; LCF = 73.02m. ; KM = 9.211m. - As calculated in the previous example, GM(F) at C.I. = 0.629m., which means the required GM(F) of 0.7m. will occur before the C.I. and the ship will not be resting fully on the keel blocks.
- P = 126.175 tons ; New W = 8748.865 tons ; Hyd. Draft = 4.526m.
MCTC = 163.282 tm. ; LCF = 73.033m.
Final trim = Initial trim -= 1.56 – 0.564 = 0.996m.
- Aft draft = 4.526 + 0.508 = 5.034m. ; Ford. draft = 5.034 – 0.996 = 4.038m.
- Drop in water level = 5.38 – 5.034 = 0.346m.
Loss in GM for fall in water level after taking the blocks overall
Example 6
M.V. Hindship of displacement 9788 tons, trim 80 cm. by the stern, KG 7.9m. and FSC 0.15m., is to be dry-docked. Calculate
- GM(F) before entering the dock.
- GM(F) and forward and aft drafts when the drop in water level is 1.0m
- Hyd. draft = 5.0m. ; MCTC = 166.8 tm. ; LCF = 72.917m. ; KM = 8.89m. ; T = 0.8m.
Corr. = 72.9170.8
143.16 = 0.413m.
Aft draft = 5.0 + 0.413 = 5.413m. ; Forward draft = 5.413 – 0.8 = 4.213m. - GM(F) = 8.89 – 7.9 – 0.15 = 0.84m.
- In this example the student has to calculate the final drafts and GM(F) when drop in water level is 1.0m. For this purpose it is necessary to ascertain whether the required drop will occur before or after the C.I. Hence first calculatedrop at C.I. as follows ---
- At C.I. ---
- Trim change
= Initial trim = 0.8
100 = P
LCF
MCTC
= P73.917
166.8
- P = 180.527tons ; New Displacement = 9788 – 180.527 = 9607.473 tons
Hydrostatic draft = 4.918m. = F & A drafts ; Drop @ C.I. = 5.413 – 4.918 = 0.495m. - Hence the required drop of 1.0m. will occur after the C.I. This means that the ship will be on even keel, side shores or bilge blocks will be in position, the ship will be fully secured, and so there will be no free surface effect.
- Hence final Aft draft = 5.413 – 1.0 = 4.413 = Forward draft = Hyd. draft
- Final displacement = 8501.405 tons; KM = 9.38m.;P = 9788 – 8501.405 = 1286.595 tons
Loss of GM = (PKG)
(W – P) = (1286.595
7.9)
(9788 - 1286.595) = 1.196m.
Final GM(F) = 9.38 – 7.9 –1.196 = 0.284m.
Example 7
M.V.
Hindship of displacement 9788 tons, trim 80 cm. by the stern, KG 7.9m.
and FSC 0.15m., is to be dry-docked. Calculate GM(F) and forward and aft
drafts when the drop in water level is 0.4 m.
- Data given in this example is same as that of Example 6. Hence, as calculated in the previous example, initial --- Hyd. draft = 5.0m. ; MCTC = 166.8 tm. ; LCF = 72.917m. ; T = 0.8m. ; Aft draft = 5.413m. ; Forward draft = 4.213m. ; TPC = 22.08 t / cm.
- As calculated in the previous example, drop at C.I. = 0.495m., which means the required drop of 0.4m. will occur before C.I. and ship will not be resting fully on the keel blocks.
- This requires a new formula as follows ---
Drop (cm.) = (PTPC) + {(P
LCF2)
(MCTC
LBP)}
Note --- Student should bear in mind that this formula should only be used when the drop of water level is given and the ship has not reached the C.I.
21090010.52 = (P23879.088) + (P
117396.907) = P
141275.995
P = 149.282tons ; New W = 9788 - 149.282 = 9638.718 tons ; Hyd. = 4.932m.
MCTC = 166.324 tm. ; LCF = 72.936m. ; KM = 8.938m. = P
LCF
MCTC = 149.282
72.936
166.324 = 65.463 cm. = 0.655m.
Final trim = 0.8 – 0.655 = 0.145m. ;= 0.145
72.936
143.16 = 0.074m.
Aft draft = 4.932 + 0.074 = 5.006m. ; Forward draft = 5.006 – 0.145 = 4.861m.- FSC = 0.15
9788
9638.718 = 0.152m.
Loss of GM = 149.2827.9
9638.718 = 0.122m.
Final GM(F) = KM – KG – Loss of GM – FSC
= 8.938 – 7.9 – 0.122 – 0.152 = 0.764m.
Example 8
M.V.
Hindship of displacement 19051 tons, KG 7.81m. and FSC 0.122m., is to
be dry-docked. Calculate the maximum permissible trim so that the final
GM(F) at critical instant is 0.3m. Also calculate initial drafts, and
final drafts and drop at C.I.
Hyd. = 9.0m. ; MCTC = 211.8 tm. ; LCF = 69.768m. ; KM = 8.388m.
Initial GM(F) = 8.388 – 7.81 – 0.122 = 0.456m. ; Loss of GM @ C.I. = 0.456 – 0.3 = 0.156m.
0.156 = (P
7.81)
(19051 – P) ; P = 373.08 tons
W @ C.I. = 19051 – 373.08 = 18677.92 tons ; Hyd. = 8.846m. ; MCTC = 209.644 tm.
LCF = 69.878m.
Forward and aft drafts @ C.I. = Hyd. = 8.846m.
Initial forward and aft drafts should be calculated using initial LCF.
Initial aft draft = 9.0 + 0.606 = 9.606m. ; forward draft = 9.606 – 1.244 = 8.362m.
Drop of W/L @ C.I. = 9.606 – 8.846 = 0.76m.
How the stability of a ship that has grounded at one point on the centerline is reduced the same way as in dry dock
A
grounded vessel may be treated as a vessel being dry docked with minor
deviations in the manner in which these cases are treated. The main
difference is that a vessel may ground overall or at any single or
multiple points between the two perpendiculars.
The
pumping out of the dry dock is equated with the rise and fall in tide
around the grounded vessel and the resultant upthrust caused by the loss
in buoyancy of the vessel. The upthrust (P) is calculated in the same
manner as a dry-docked vessel, by either treating the virtual rise in in
GM to be caused by a rise in G or a drop in M.
A
point of divergence is when the change in trim is considered. In a dry
docked vessel the trimming moment is calculated as the product of the
upthrust (P) and the LCF from the APP (And in the rare case of dry
docking a vessel that is down by the head the FPP). If the vessel
aground is grounded at a single point between the APP and the FPP, the
trimming moment will be the product of the upthrust (P) and the distance
of the grounding point from the APP. Similarly the change in trim is
also similarly considered.
The
most powerful force available for floating a grounded vessel is the
additional buoyancy created by the rise in tide. Needless to say, if a
vessel grounds at the "top of the tide", she is in extreme danger since
the tide has a long way to fall, and there will hardly be any additional
buoyancy to assist the ships refloating.
An
inspection of the drafts all round the vessel gives us sufficient data
to find the point of grounding by considering the change in trim as the
tide rises or falls. Example 7 considers these aspects and a close study
of it will help the student to have a fuller understanding of a
grounded vessel.
In
this section we will consider single point groundings on the
centerline, and the list of vessels that ground at points to port or
stbd of the centerline.
How up thrust increase with fall in tide, increases the heeling moment and reduces the stability
As
discussed in the previous topic, a drop in tidal levels leads to a
increase in upthrust (P) and with it a rise in the virtual loss of GM.
If the point of grounding is off the centerline, this upthrust (P) also
causes a heeling moment that increases with the fall in water level and
heels the vessel and if the fall is high enough the vessel can capsize.
Grounded & Heeled
Virtual loss in GM and drafts of a ship after tide has fallen by a stated amount
Please refer to the topic 'Point of grounding given initial drafts and drafts after grounding'.
Point of grounding given initial drafts and drafts after grounding
All examples of grounding are solved by the following formulae
- TC during grounding = P
D
MCTC
- Loss of GM during dry-docking = P
KG
(W – P) OR = P
KM
W
- Final GM(F) = KM – Initial KG – Loss of GM - FSC
- Fall of tide (cm.) = (P
TPC) + {
(MCTC
LBP)}
- P is loss of displacement and D is the distance of point of grounding from the COF.
Student
should bear in mind that the last formula should only be used in case
of beach grounding, when the fall of tide is given and the ship has not
reached the rest position i.e. it is not fully resting on the beach.
Example 1
M.V.
Hindship in condition No. 10 runs aground on a rock. After fall of tide
the drafts are Ford. 6.0m. and Aft 9.2m. Calculate the position of
point of grounding, final GM(F) and the rise of tide required to refloat
the ship.
Calculate initial data of the ship
W = 16133 tons ; LCG = 70.289m. ; KG = 7.57m. ; FSM = 1372 tm. ;
Hyd. = 7.788m. ; MCTC = 194.432 tm. ; LCB = 72.644m. ; LCF = 70.792m.
BG = LCB – LCG = 72.644 – 70.289 = 2.355m.
T = W
BG
MCTC = 16133
2.355
194.432 = 195.406 cm. = 1.954m. (Stern)
Calculate final data of the ship after fall of tide
T = 9.2 – 6.0 = 3.2m. ; Mean draft = (6.0 + 9.2)
2 = 7.6m. ; LCF for mean draft = 70.979m.
Corr. = T
LCF
LBP = 3.2
70.979
143.16 = 1.587m.
Hyd. = Aft draft – Corr. = 9.2 – 1.587 = 7.613m.
Loss of P = 16133 - 15723.42 = 409.58 tons
Because the trim has increased, the point of contact will be forward of Center of Floatation.
Distance of the point of contact from A.P. = 58.404 + 70.966m. = 129.37m.
Calculate draft at the point of contact in initial condition
Distance of point of contact from COF in initial condition = D = 129.37 – 70.792 = 58.578m.
Corr. = T
D
LBP = 1.954
58.578
143.26 = 0.8m.
Draft at point of contact = Hyd. – Corr. = 7.788 – 0.8 = 6.988m.
Note: Sign is –ve because the trim is by stern and point of contact is forward of COF.
Calculate draft at the point of contact after grounding
Corr. = T (Final)
LBP = 3.2
58.404
143.26 = 1.305m.
Draft at the point of contact = Hyd. – Corr. = 7.613 - 1.305 = 6.308m.
Rise of tide required to refloat the ship = 6.988 – 6.308 = 0.68m.
Loss of GM during grounding = P
KG
W1 = 409.58
7.57
15723.42 = 0.197m.
Final FSC = FSM
= 1372
15723.42 = 0.087m.
GM(F) = Final KM – KG – Loss of GM – Final FSC
= 8.238 – 7.57 – 0.197 – 0.087 = 0.384m.
Example 2
M.V.
Hindship floating at drafts F 7.9m., A 9.8m., KG 7.7m. and FSC 0.092m.,
runs aground at the forward end on a beach having a slope of 3m. by the
stern. If the tide falls by 0.5m., what will be the final GM(F) and
drafts?
T = 1.9m. (Stern) ; Mean draft = 8.85m. ; LCF for mean draft = 69.875m.
Corr. = T
LCF
LBP = 1.9
69.875
143.16 = 0.927m. ; Hyd. = 9.8 – 0.927 = 8.873m.
W = 18742.39 tons ; TPC = 24.064 T/cm. ; MCTC = 210.022 tm. ; LCF = 69.859m.
D = Distance of COF from F.P. = LBP – LCF = 143.16 – 69.859 = 73.301m.
For
a fall of tide of 0.5m., the ship may not be fully resting on the beach
or it may be so resting. To resolve this ambiguity, calculate the fall
of tide when the ship just reaches the rest position.
TC till the rest position = 3.0 – 1.9 = 1.1m. = 110 cm. = P
D
MCTC
= P
73.301
210.022
P (Till rest position) = 315.172 tons ; W (At rest) = 18742.39 – 315 172 = 18427.218 tons
Hyd. at rest = 8.743m. ; LCF at rest = 69.955m.
Aft draft = 8.743 + 1.466 = 10.209m. ; Ford. draft = 10.209 – 3.0 = 7.209m.
Fall of tide = Initial Ford. draft – Final Ford. draft = 7.9 – 7.209 = 0.691m.
As
the fall of tide given in the example is less than the fall of tide
required to reach the rest position, hence the ship has not reached the
rest position.
Fall of tide = (P
Initial TPC) + {(P
Initial
)
(Initial MCTC
LBP)}
Student
should note that this formula should be used only when the fall of tide
is given and the ship has not reached the rest position.
0.5
100 = 50 cm. = (P
24.064) + {
(210.022
143.16)}
50
24.064
210.022
143.16 = (P
210.022
143.16) + (
24.064)
36176313.02 = (P
30066.750) + (P
129296.753) = P
159363.503
P = 227.005 tons ;
= 18515.385 tons ; Hyd. = 8.779m. ; MCTC = 208.685 tm.
LCF = 69.927m. ;
= LBP – LCF = 143.16 – 69.927 = 73.233m. ; KM = 8.348m.
Final trim = Initial trim +
= 1.9 + 0.797 = 2.697m.
Aft draft = 8.779 + 1.317 = 10.096m. ; Ford. draft = 10.096 – 2.697 = 7.399m.
Loss of GM = P
KG
W1 = 227.005
7.7
18515.385 = 0.094m.
New FSC = 0.092
18742.39
18515.385 = 0.093m.
Final GM(F) = KM – KG – Loss of GM – New FSC = 8.348 – 7.7 – 0.094 – 0.093 = 0.461m.
Example 3
M.V.
Hindship floating in SW at drafts F 6.0m., A 9.0m., KG 7.5m. and FSM
1000 tm., runs aground on a sloping beach. Soundings taken immediately
after grounding showed that the depth of water at forward end was 7m.
and at aft end it was 9m. Calculate the fall of tide and the drafts when
the GM(F) becomes 0.6m.
T = 3.0m. ; Mean draft = 7.5m. ; LCF for mean draft = 71.086m.
Corr. = 3
71.086
143.16 = 1.49m. ; Hyd. = 9 – 1.49 = 7.51m. ; W = 15482.85 tons
MCTC = 190.54 tm. ; LCF = D = 71.075m. ; KM = 8.238m.
From
the given soundings it is clear that the ships bows are in deep waters
while the stern has just touched the ground i.e. the point of contact is
the A.P. and slope of the beach is 2m. by the stern. Hence in the
formulae for grounding D = LCF.
For the GM(F)
to become 0.6m., the ship may not be fully resting on the beach or it
may be so resting. To resolve this ambiguity, calculate the GM(F) when
the ship just reaches the rest position.
TC till the rest position = 3.0 – 2.0 = 1m. = 100 cm. (By head) = P
D
MCTC
= P
71.075
190.54
P (Till rest position) = 268.083 tons ; W (At rest) = 15482.85 – 268.083 = 15214.767 tons
Hyd. at rest = 7.395m. ; KM at rest = 8.238m.
Loss of GM = P
KG
W(at rest) = 268.083
7.5
15214.767 = 0.132m.
FSC = 1000
15214.767 = 0.066m. ; GM(F) at rest = 8.238 – 7.5 – 0.132 – 0.066 = 0.54m.
As the GM(F) given in the example is more than the GM(F) at the rest position, hence the ship has not reached the rest position.
GM(F) = Initial KM – KG – Loss of GM – FSC
= Initial KM – KG – {(P
KG)
(W – P)} – {FSM
(W –P)}
0.6 = 8.238 – 7.5 – {(P
7.5)
(15482.85 – P} – {1000
(15482.85 – P)}
0.138 = {(P
7.5) + 1000}
(15482.85 – P)
P
7.638 = 1136.633 ; P = 148.813 tons
Final trim = 3.0 – 0.558 = 2.442m. (Stern)
Aft draft = 7.446 + 1.214 = 8.66m. ; Ford. draft = 8.66 – 2.442 = 6.218m.
Fall of tide = Initial aft draft – final aft draft = 9.0 – 8.66 = 0.34m.
No comments: