Translate

Sunday, May 24, 2020

BANWAS 2nd MATE (F.G.) – MMD EXAMS SOLVED Past Question Paper

Q)  What  is  the  purpose  of  „BNWAS‟  and  describe  the  sequence  of  warnings required to  be  generated by  the  BNWAS system.  (Sept-19,  Sept-18) 
Ans:-  BRIDGE NAVIGATIONAL  WATCH  ALARM  SYSTEM  (BNWAS):-   
Purpose:-   
  The  purpose  of  a  bridge  navigational  watch  alarm  system  is  to  monitor  bridge activity  and  detect  operator  disability  which  could  lead  to  marine  accidents. 
  The  system  monitors  awareness  of  the  Officer  of  the  Watch  (OOW)  and automatically  alerts  the  Master  or  another  qualified  person  if,  for  any  reason,  the OOW becomes incapable  of performing  OOW duties. 
  This  purpose  is  achieved  by  series  of  indications  and  alarm  to  alert  first  the  OOW and,  if  he  is  not  responding,  then  to  alert  Master or another qualified  person. 
  Additionally,  the  BNWAS  provides  the  OOW  with  means  of  calling  for  immediate assistance if  required. 
OPERATIONAL MODES:- 
BNWAS  should  incorporate the  following  3 operational  modes:   
1)  Automatic 
2)  Manual  „ON‟ 
3)  Manual  „OFF‟ 

1)  Automatic:  The  BNWAS  is  automatically  activated  when  the  vessel  is  navigating  by means  of  heading  or  track  control  system  (autopilot  /  trackpilot)  and  inhibited when  this  system  is  deactivated. 
2)  Manual  ON:  The  BNWAS  is  always  in  operation. a.  Authorized  person  (Master)  switches  on  system  by  single  turning  the  keyswitch  to  position  "ON/OFF". b.  Once  dormant  period  (3  min,  9  min,  12  min)  is  set,  the  authorized  person pulls  out  the  key. c.  Dormant  period  starts  from  the  moment  the  system  has  been  switched  on. 
3)  Manual  OFF:  The  BNWAS  is  turned  off  completely. 

ALERT  SEQUENCE:-  If  dormant  period  is  over  without  the  OOW  resetting,  the system  activates  all  reset  units  by  flash  light. 

ALERT  STAGE  1:-  If  dormant  period  and  flash  light  period  (15  sec)  are  over  and  the OOW  has  not  yet  resetted  the  button,  the  system  activates  electronic  buzzer  on terminal  board  as  well  as  additional  buzzers located  on  the  bridge  and  wing  area. 

ALERT  STAGE  2:-  If  dormant  period,  flash  light  period  (15  sec)  and  alert  stage  1  (15 sec)  are  over  without  OOW's  reset,  system  activates  further  alert  via  optic  /  acoustic alarm  devices  in  officer's area  (cabins  or staircase)  as  well  as  for  VDR  link. 

ALERT  STAGE  3:-  If  dormant  period,  flash  light  period  (15  sec),  alert  stage  1  (15 sec)  and  alert  stage  2  (90  sec)  are  over  without  OOW's  reset,  the  system  activates the  General  Alarm  as  well  as  for  VDR  link. 
EMERGENCY  CALL:- 
  The  OOW  generates  an  emergency  call  by  pushing  any  reset  unit  longer  than  5 sec. 
  That  immediately  activates  alert  stage  2 and  subsequently  alarm  stage  3. 
  After emergency  call  has  been  released,  reset  is  possible  by  pushing  a  reset  unit. REQUIREMENTS:- 
  The  bridge  navigational  watch  alarm  system  shall  be  in  operation  whenever  the ship  is  underway  at  sea. 
  System  is  powered  by  ships  main  power  and  MUST  have  a  battery  back  up  giving a  minimum  of  6  hours usage. 
CARRIAGE  REQUIREMENTS:- 
1)  Cargo  ships  of  150  grt  and  upwards  and  passenger  ships  irrespective  of  size constructed  on  or after 1  July  2011; 
2)  Passenger  ships  irrespective  of    size  constructed  before  1  July  2011,  not  later  than the  first  survey  after 1  July  2012; 
3)  Cargo  ships  of  3000  grt  and  upwards  constructed  before  1  July  2011,  not  later than  the  first  survey  after 1  July  2012; 
4)  Cargo  ships  of  500  grt  and  upwards  but  less  than  3000  grt  constructed  before  1 July  2011,  not  later than  the  first  survey  after 1  July  2013;  and 
5)  Cargo  ships  of  150  grt  and  upwards  but  less  than  500  grt  constructed  before  1 July  2011,  not  later than  the  first  survey  after 1  July  2014. 




No comments:

Post a Comment